Netboom assembled into storage Container in Szczecin

In late January the SBOIL netboom and storage Container were brougth together in Szczecin.  The Team of the Maritime University of Szczecin and the University of Rostock assemled the netboom into the storange Container. The Container is a standard  20ft Container customized by the Maritime University of Szczecin based on the needs defined by the University of Rostock who designed the netboom. The Container is equipped with a generator and a winch to recover the netboom. This procedure was tested for the first time and went very well. From now on, the netboom can be transported in and deployed from the container. A first water Trial will be carried out in spring 2018.